Every item in the scope was agreed upon upfront in a written quote. No surprises, no additions billed without approval.
Full removal of the 100A fuse board and installation of a commercial-grade 400A three-phase main service panel with 48 circuit positions.
Two dedicated 200A sub-panels installed per floor zone for isolated, individually protected distribution across all areas of the building.
Integrated real-time load monitoring system with mobile dashboard, automatic alerts, and intelligent load-shedding on non-critical circuits during peak demand.
Four dedicated 50A circuits and conduit runs installed to the basement car park, ready for Level 2 EV charger connection without further structural work.
Complete arc-fault and ground-fault protection, bonding and earthing upgrade to current NEC 2023 standards, and full compliance documentation issued.
Full circuit-by-circuit load testing under live conditions, insulation resistance testing on all new wiring, and witnessed commissioning with the building manager before sign-off.
400A
0
— Sarah M., Manchester